Skip to content
  • Call us

519.503.8768

  • HOME
  • Services
    • FOUNDATION REPAIR
    • STEEL SILO CONSTRUCTION
    • WATERPROOFING
    • SILO REPAIR
    • SHOTCRETE (GUNITE) POOL CONSTRUCTION
  • CONTACT US
  • ABOUT US
  • FIELD INSIGHTS
  • HOME
  • Services
    • FOUNDATION REPAIR
    • STEEL SILO CONSTRUCTION
    • WATERPROOFING
    • SILO REPAIR
    • SHOTCRETE (GUNITE) POOL CONSTRUCTION
  • CONTACT US
  • ABOUT US
  • FIELD INSIGHTS
GET IN TOUCH

Archives

SILO 4 REHAB: MITIGATING ALKALI-SILICA REACTION IN 1950s INFRASTRUCTURE.

We encountered severe spalling in the lower ring beam due to reactive aggregate. Here is how the engineering team executed a carbon-fiber wrap solution to restore 100% load capacity.

CRITICAL CURE: ENGINEERING CONCRETE STABILITY IN -25°C ENVIRONMENTS.

Standard hydration stops when the mercury drops. We analyze the structural integrity data from our northern deployments in Fort McMurray and introduce the new “Thermal-Blanketing” protocol that guarantees 40MPa strength without halting critical winter operations.

KOCH

Restoring the backbone of Canadian Industry since 1985. Uncompromising precision, safety, and structural integrity.

Instagram Facebook

Company

  • HOME
  • Services
    • FOUNDATION REPAIR
    • STEEL SILO CONSTRUCTION
    • WATERPROOFING
    • SILO REPAIR
    • SHOTCRETE (GUNITE) POOL CONSTRUCTION
  • CONTACT US
  • ABOUT US
  • FIELD INSIGHTS
  • HOME
  • Services
    • FOUNDATION REPAIR
    • STEEL SILO CONSTRUCTION
    • WATERPROOFING
    • SILO REPAIR
    • SHOTCRETE (GUNITE) POOL CONSTRUCTION
  • CONTACT US
  • ABOUT US
  • FIELD INSIGHTS

Expertise

  • SILO RESTORATON
  • SHOTCRETE / GUNITE
  • WATERPROOFING
  • STRUCTURAL REPAIR

CERTIFICATIONS

ISA

WSIB

  • 1850 Line 34, Shakespeare, ON N0B 2P0

© 2026 Koch Construction. All rights reserved.

  • 519.503.8768