SILO 4 REHAB: MITIGATING ALKALI-SILICA REACTION IN 1950s INFRASTRUCTURE.

We encountered severe spalling in the lower ring beam due to reactive aggregate. Here is how the engineering team executed a carbon-fiber wrap solution to restore 100% load capacity.
CRITICAL CURE: ENGINEERING CONCRETE STABILITY IN -25°C ENVIRONMENTS.

Standard hydration stops when the mercury drops. We analyze the structural integrity data from our northern deployments in Fort McMurray and introduce the new “Thermal-Blanketing” protocol that guarantees 40MPa strength without halting critical winter operations.